Production

Epifor for
Production

Every order located, every work center loaded, and the delay named while there is still time to do something about it.

Every operation reports where it happens, so the board on your screen is the floor as it is right now: jobs, work centers, operators, elapsed time. When the day changes, the plan changes with it, and the floor finds out at the station rather than at shift change.

What changes for you

01

Every order located, without walking the floor

Which order is at which work center, how far through it is, who is on it and how long it has been standing there. Sales can be answered in the time it takes to look at a screen.

02

A schedule that survives the day

Work center groups are planned as one capacity pool rather than separate queues, and the load rebalances when a machine goes down. The plan you set in the morning adjusts instead of expiring.

03

Rush orders that do not wreck the week

Urgent jobs get an explicit priority level that reorders the queue at every affected work center immediately. Nobody is standing at a whiteboard, and nobody finds out at the next handover.

04

Bottlenecks named while it still matters

Completion dates are projected from live conditions and the work center causing a slip is identified. You get the problem while you can still move something rather than on the day the order was due.

05

The floor has what it needs

Drawings, specifications and quality fields are distributed only to the work centers that need them, in the current revision. Work is released against material availability, so a job is not pushed to the first operation while the material for the third is still on a truck.

06

Downtime with a cause attached

Stoppages are captured with alarms and root cause analysis, and the time lands on the order that lost it. The same fault stops appearing every month without anyone tracking why.

The screens you live in

+
+
+
+

Order board

Every order live, with work center and elapsed time.

Work center queues

What is next at each station.

Capacity load

Load across every work center group.

Downtime log

Stoppages with alarms and root cause.

What you stop doing

✕
Walking the floor to find out where a job is.
✕
Rebuilding the schedule on a whiteboard after one phone call.
✕
Telling sales you will check and call back.
✕
Learning about a delay at the next shift change.
✕
Chasing operators for their hours on Friday afternoon.

Frequently asked questions

Q.01
Our routings change constantly. Does that break the plan?
No. Routings are defined per order and can be changed after release, and the schedule reflects the change immediately rather than at the next planning run.
Q.02
Will operators report properly, or will I be chasing them?
Reporting is the interaction, not an extra task. Tap to start, tap to finish, record quantity good and quantity scrapped, at a terminal at the work center. Operators learn it in about five minutes.
Q.03
What happens when a machine goes down?
The stoppage is captured with a reason, load rebalances across the work center group, and the orders that will now miss are flagged with the work center causing it.
Q.04
Do we have to replace our ERP?
No. Epifor sits between the ERP and the floor, with two-way integration.
Free online presentation

See Epifor on
your own production

Book a 30-minute presentation and we will walk through Epifor using a live order from your floor.

Grow with confidence
Chat with us